Changelog
Review version notes, compatibility changes, and rollback requirements before updating.
Step-by-step instructions
- 1Compare the installed version with the current plugin detail page.
- 2Read compatibility, limitations, and release date notes.
- 3Back up staging and production before updates.
- 4Update staging, run workflow tests, then schedule production rollout.
- 5Keep rollback notes and the previous package until the release is accepted.
Examples
Changelog entry
## 1.2.0 - 2026-04-30
- Reviewed compatibility notes
- Updated configuration guide
- No verified public download metrics publishedVersion-specific notes
If a package has no public changelog yet, treat the update as higher risk and test more carefully.